PROJECT MANUFACTURING PRINCIPLES
ANNOUNCEMENTS

PROJECT MANUFACTURING PRINCIPLES

Torunlar REIC Project Manufacturing Application Principles

 

1) EARTHQUAKE REGULATIONS

All of our projects we build are certified by the Turkish Standards Institute (TSE) in force on the date of the construction license fully in accordance with the prepared standards and the Earthquake Regulation on Buildings to be constructed in Earthquake Zones has been put into practice.


2) GROUND SURVEYS

In order to understand the existing ground conditions of our projects and to decide on the engineering parameters, we have prepared soil borings are carried out, and as a result of laboratory tests and examinations on the samples taken from the borings Static projects are prepared according to the Geotechnical Survey Report.


3) STATIC PROJECT DESIGN

Static projects of foundations / columns / beams and slabs according to the geotechnical survey report by the most competent static project authors
is prepared. According to these calculations, building supervision authorities are present at the project site during all construction phases and
inspects whether the production is carried out according to the project and scientific rules.

4) MANUFACTURING

Our constructions have been and are being constructed with reinforced concrete tunnel formwork, conventional formwork or steel structural elements.
The foundations of the buildings are constructed as raft, and bored pile and jet grout systems are applied in the sections deemed necessary in the Geotechnical Survey Report.

5) CONCRETE

Concrete class varies according to the project. C30, C40, CSO, C60 concrete is used.

6) BUILDING INSPECTION

All kinds of manufacturing (iron, concrete, etc.) inspections of all our constructions, TOKI, KIPTAŞ or ministry from public institutions and organizations
by the technical teams of independent building inspection companies authorized by the Ministry of Environment and Urbanization.

7) BUILDING USE PERMIT

Certificates of Occupancy have been obtained for all of our completed buildings, and the relevant municipalities have been re-issued by the relevant municipalities during the occupancy phase compliance with architectural, static, electrical and mechanical projects have been checked and approved.

Within the framework of all this information, detailed building tags of our projects are given below.